Projects per year
- 50 - 88 out of 88 results
Search results
-
Finished
An investigation on the influence of the manufacturing techniques on the mechanical properties of glass fibre reinforced polymer composites
Lu, J.
1/10/18 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M.
1/10/18 → 30/09/23
Project: Other Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M.
1/10/18 → 30/09/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Fifth International Conference on Offshore Energy and Storage
Galea, M.
1/09/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The effects of interdiffusion between TBCs and single crystal superalloys on the mechanical characteristics
Chen, H. (PI)
1/09/18 → 31/12/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
光固化树脂脱附处理技术研发
Zhu, G. (PI)
Ningbo Shisheng Technology Co., Ltd
17/08/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Geometrical and material measurement and analysis of a provided sawing blade and new blade development
Li, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research and Development of Upper limb Motion capture system based on flexible stretch Sensing Technology
Zhu, G. (PI)
1/07/18 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Technical development of thermoplastic composites
Liu, X. (PI)
30/03/18 → 30/09/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Power Tools Design
Shih, Y. T.
1/03/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Numerical simulation and experimental study of flash boiling spray characteristic of direct injection gasoline engine
Zhang, X. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Improve the Ductility of NdFeB materials
Chen, H. (PI)
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Investigation on the high temperature creep behaviour of thermal barrier coating systems
Chen, H. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
"Investigation on gas-liquid-solid three phase flow coupled with meso-scale particle-bubble interactions, particle-liquid turbulence and bubble induced turbulence in bubble column reactors"
Yang, X. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
light-weight and high-strength SMC Composites Materials
Liu, X. (PI)
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Precursors synthesis process and stintering process optimization
Li, G. (PI)
1/08/17 → 30/09/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Novel reactor industrialization development of precursor of lithium battery anode material
Yang, X. (PI)
1/04/17 → 31/12/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Taylor reactor micro-fine particle liquid-solid two-phase flow transport behavior modulation
Li, G. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
An investigation of composite aircraft fire protection
Liu, X. (PI)
1/01/17 → 31/12/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Innovation Design Joint Lab
Sun, X. (PI)
1/01/17 → 31/12/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
ACC TECH and NOTTINGHAM UNIVERSITY JOINT LABORATORY in SUSTAINABLE COMPOSITES MATERIALS
Liu, X. (PI)
1/01/17 → 1/01/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Investigations of power flow characteristics of nonlinear vibration isolation systems
Yang, J. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
R&D of Novel thermoplastic composite
Liu, X. (PI)
1/01/17 → 31/12/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
GF/CF composite recyling and reuse
30/11/16 → 30/11/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on active structural vibration control using a compliant actuation mechanism with the passive vibration energy absorption property
Halim, D. (PI)
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The 3D Printing Technology and Characterisation of Body Resorbable Composite3D
Liu, X. (PI)
1/05/16 → 30/04/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The 3D Printing Technology and Characterisation of Body Resorbable Composite3D
Liu, X. (PI)
1/05/16 → 30/04/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Investigation on gas-liquid-solid three phase flow coupled with meso-scale solid-liquid turbulence and bubble induced turbulence in bubble column reactors
Yang, X. (PI)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Lattice Boltzmann Method for Micro- and Nanoscale Fluid Flows and Heat Transfer
Shi, Y. (PI)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Mechanism of coupling between fluid dynamics and chemical reaction in the process of synthesising of micro fine powder materials using combined reactors and the process control
Yang, X. (PI)
1/01/16 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on gas-liquid-solid three phase flow coupled with meso-scale solid-liquid turbulence and bubble induced turbulence in bubble column reactors
Yang, X. (PI)
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Droplet Fission and Emulsion Templated Microparticle Mechanics in Bifurcated Bilayer Microfluidic System
Ren, Y. (PI)
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Low Carbon Automobile Thermal Management Frontier Technology Innovation Team
Shi, Y. (PI)
1/12/15 → 30/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Marine Composites Development and Manufacturing for Sustainable Environment
Liu, X. (PI)
1/10/15 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Interaction Design for Information Encounter in the Context of Research Work
Sun, X. (PI)
Ningbo Science and Technology Bureau
1/06/15 → 30/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Key technical research on thermal management of gasoline direct-injection engine used vehicle
Shi, Y. (PI)
1/03/15 → 31/03/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Interaction Design for Information Encounter In the Context of Research Work
Sun, X. (PI)
National Natural Science Foundation of China (NSFC)
1/01/15 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects