Keyphrases
Decision-making Process
100%
Flexible Manufacturing System
100%
Decision System
100%
Control Decision
100%
Response Time
60%
Routing Flexibility
60%
Control Strategy
40%
Decision Maker
40%
Real-time Control
40%
Real-time Decision Making
20%
Performance Enhancement
20%
Makespan
20%
Dispatching Rules
20%
Automation Level
20%
Shop Floor Management
20%
Computer Simulation Modeling
20%
Dispatch Decision
20%
System Decision
20%
Operations Managers
20%
Level Control
20%
Sequencing Rules
20%
Decision-making Approach
20%
Manufacturing System Control
20%
Decision Automation
20%
Engineering
Responsiveness
100%
Flexible Manufacturing System
100%
Response Time
75%
Control Strategy
50%
Decision Maker
50%
Computer Simulation
25%
Decision Time
25%
Lead Time
25%
Shop Floor
25%
Level Control
25%
Manufacturing Control Systems
25%
Computer Science
Decision-Making
100%
Control Decision
100%
Response Time
37%
Routing Flexibility
37%
Decision Maker
25%
Control Strategy
25%
Information System
12%
Performance Enhancement
12%
Computer Simulation
12%
Dispatching Rule
12%
Operation Manager
12%
Simulation Modeling
12%
Social Sciences
Decision-Making Process
100%
Decision Making
60%
Reaction Time
60%
Decision Maker
40%
Information Systems
20%