Projects per year
Search results
-
Finished
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
Li, B. (PI)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Flexural behaviour of reinforced concrete beam strengthened by fabric reinforced alkali-activated mortar
Li, B. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
Li, B. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects